Foothills Mall Redevelopment

    Ft. Collins, CO

This redevelopment site consists of a 74 acre site to include, soil correction, installation of new water, storm and sanitary. Rain garden surround the property with under drain tying into an intricate storm water system. Box culvert installed along the main traffic artery while maintaining access to all local businesses.

 
Project Facts
  • In excess of 2 miles of Water.
  • 1 ½ miles of Sanitary Sewer.
  • 3 miles of landscape drain.
  • 2 ½ miles of Storm Sewer.
  • ¼ mile of 22’x7’ concrete box culvert.
  • Import in excess of 50,000 Tons of material.
  • 2 Million square feet of fine grading.
  • Over 40,000 man hours without a lost time incident.
  • Daily quality pre-start safety meetings.
  • All tasks completed on schedule.
 