FOUR SEASONS TEATRO
Four Seasons Teatro - Denver, CO
A downtown Denver excavation over 30’ deep. Over 80,000 cubic yards of material excavated and trucked from the site, during a 7 day/week condensed schedule.
General Contractor: Swinerton Builders
Project Facts:
80,000 cubic yards of export.
Over 400 truckloads per day in downtown Denver.
Tower Section over 50’ deep—required 2,800 cubic yards of concrete during continuous pour.
Demolition required removal of existing foundations dating back to the 1800’s.