Four Seasons Teatro - Denver, CO

A downtown Denver excavation over 30’ deep. Over 80,000 cubic yards of material excavated and trucked from the site, during a 7 day/week condensed schedule.

General Contractor: Swinerton Builders

Project Facts:

  • 80,000 cubic yards of export.

  • Over 400 truckloads per day in downtown Denver.

  • Tower Section over 50’ deep—required 2,800 cubic yards of concrete during continuous pour.

  • Demolition required removal of existing foundations dating back to the 1800’s.