Midway Office Warehouse
Midway Office Warehouse - St. Paul, MN
Belair provided & installed the vapor extraction system for the Midway office & warehouse building. It included a 20 horse power blower, and a condensate knockout pot was sized for 800 SCFM with less than 1” column pressure deep.
Contractor: RJ Ryan
Project Facts:
This project was assembled in an incredibly tight timeframe to meet occupancy demands for the office/building.
8 week lead time to complete project